Dedicated and safe footpaths
BREEAM UK New Construction, Non-domestic Buildings (United Kingdom), Technical Manual, SD5078: BREEAM UK New Construction 2018 3.0, published by BRE Global Limited, suggests that dedicated and safe footpaths are:
Marked-out and clearly signed routes to accommodate building users arriving on and travelling through the assessed site on foot. They must also have the following features:
- Dedicated pedestrian crossing points are provided where needed to allow pedestrians to cross vehicle access routes
- Appropriate traffic calming measures are in place to slow traffic at any crossing points
- Developments with high numbers of visitors provide signposting to other local amenities and public transport nodes off site (where existing)
- Adequate external lighting in accordance with BS 5489-1:2013 Lighting of roads and public amenity areas.
[edit] Related articles on Designing Buildings Wiki
- Are electric bikes the future?
- BRE articles.
- BREEAM.
- Building Research Establishment.
- China has just built the world’s longest elevated cycle path.
- Cycle storage.
- Cycling and walking plan.
- Dedicated and safe cycle lanes.
- Designing for cycle traffic.
- Dedicated pedestrian crossing.
- Safe pedestrian route.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
















